Concrete Is Now In
Wow, what a week we have had! In one week the plumbing and concrete was able to get done. As a bonus I was able to meet and connect with two new veterans. One day at a time the Carriage House is rising from the ground.
So where are we at this point: All the bands have been place around the framing, the plumbing is stubbed up through the concrete, the septic is in the ground but not connected, concrete has been laid, all the rafter truss carriers have been place except the garage and I will do that today, the electrical conduit has been stubbed through the concrete – ready for the electrical wiring to come into the building, and with the extra concrete they over ordered we were able to add some more support around the foundation!
As I said “Wow” so much has happened. I will jump back into completing the little things so we are ready for rafters next week. Rafters, roofing, windows, doors, and siding and we will be dried in. SO EXCITING!
Keep in touch, every day’s a new day! Thank you all so much for walking this journey with us.