It’s Time To Tidy Things Up
Good morning All, well it has been a little bit since I have posted but work on PMR has still been moving along. The major parts of the chicken coop and horse shelter are done. I just have some small finish work to do. I have to place some trim on the structures and rain prevention. I need to fix the rain barrel system, I still need to caulk different places but those two projects are nearly finished. I will be having some surgeries in the near future, so building and getting the property closer to 100% ready will have to slow down.
I will still be posting our journey and the journey we are establishing for our Veterans and those in need. things still left to be done are: finish the Carriage House, complete the septic system, paint buildings and posts, move what is in the shop to the Carriage House and then rebuild the shop in the back pasture so the cattle can have shelter in bad storms, build a cellar, develop the lower landing for Rv’s, camping, and future possibilities of a leather training and production shop, and putting in more parking up by the living spaces.
It is a journey and a continuing road. We will keep you up to date and involved.